Skip to content

chore(desktop): prepare canary 0.0.21 - #212

Merged
iamnbutler merged 1 commit into
mainfrom
codex/canary-0-0-21
Oct 7, 2026
Merged

iamnbutler merged 1 commit into
mainfrom
codex/canary-0-0-21

Conversation

@iamnbutler

Copy link
Copy Markdown
Contributor

Prepare canary 0.0.21 so installed 0.0.20 builds can receive the merged Agentation integration (#209) and desktop sizing fixes (#211). This increments only the desktop bundle version; the signed release workflow will validate and publish the exact merged revision. Related: #7.

Validation: frozen-lockfile install, package formatting, and diff checks pass. Release CI runs the complete type, formatting, and lint checks before signing and notarization.

Built in Ace

The version edit, checks, and GitHub operations ran through the real canary-0-0-21 Ace channel terminal. Codex coordinated the work through an external harness because Ace cannot host that harness yet (#9). A managed clean checkout preserves the pre-existing native recovery backup (#173).

@iamnbutler
iamnbutler merged commit b35cbbe into main Oct 7, 2026
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant