21 changes: 11 additions & 10 deletions docs/progress/MASTER.md
Original file line number Diff line number Diff line change
Expand Up @@ -27,7 +27,7 @@
| 1 | Evidence Contract Foundation | https://github.com/TokenDanceLab/AgentHub/milestone/17 | 0 | 4 | 4 |
| 2 | Shared Chat Timeline Hardening | https://github.com/TokenDanceLab/AgentHub/milestone/18 | 0 | 4 | 4 |
| 3 | Desktop/Web Boundary And Backend Truth | https://github.com/TokenDanceLab/AgentHub/milestone/19 | 0 | 3 | 3 |
| 4 | Real E2E And Visual QA Closure | https://github.com/TokenDanceLab/AgentHub/milestone/20 | 1 | 2 | 3 |
| 4 | Real E2E And Visual QA Closure | https://github.com/TokenDanceLab/AgentHub/milestone/20 | 0 | 3 | 3 |
| 5 | Acceptance, Merge, Archive | https://github.com/TokenDanceLab/AgentHub/milestone/21 | 2 | 0 | 2 |

## Issue Mapping
Expand All @@ -47,7 +47,7 @@
| T3.3 | #388 | Observed and approved-real manifest boundary | closed via #410 |
| T4.1 | #389 | Add focused chat acceptance gate | closed via #412 |
| T4.2 | #390 | Add semi-automated Visual QA artifact loop | closed via #414 |
| T4.3 | #391 | Keep packaged Desktop claim separate | open |
| T4.3 | #391 | Keep packaged Desktop claim separate | closed via #416 |
| T5.1 | #392 | Run final acceptance matrix | open |
| T5.2 | #393 | Merge readiness and archive SPEC | open |

Expand All @@ -64,14 +64,14 @@ gh issue list -R TokenDanceLab/AgentHub --label "spec-driven" --state all --json
- [x] Phase 1: Evidence Contract Foundation (4/4 tasks) - [milestone](https://github.com/TokenDanceLab/AgentHub/milestone/17)
- [x] Phase 2: Shared Chat Timeline Hardening (4/4 tasks) - [milestone](https://github.com/TokenDanceLab/AgentHub/milestone/18)
- [x] Phase 3: Desktop/Web Boundary And Backend Truth (3/3 tasks) - [milestone](https://github.com/TokenDanceLab/AgentHub/milestone/19)
- [ ] Phase 4: Real E2E And Visual QA Closure (2/3 tasks) - [milestone](https://github.com/TokenDanceLab/AgentHub/milestone/20)
- [x] Phase 4: Real E2E And Visual QA Closure (3/3 tasks) - [milestone](https://github.com/TokenDanceLab/AgentHub/milestone/20)
- [ ] Phase 5: Acceptance, Merge, Archive (0/2 tasks) - [milestone](https://github.com/TokenDanceLab/AgentHub/milestone/21)

## Current Status

**Active Phase**: Phase 4
**Active Task**: T4.3 - Keep packaged Desktop claim separate (#391)
**Blockers**: None for execution. Phase 4 drift_score is 1 after #390, below the replan threshold. GitHub Project board requires refreshed `project` scope and is intentionally skipped.
**Active Phase**: Phase 5
**Active Task**: T5.1 - Run final acceptance matrix (#392)
**Blockers**: None for execution. Phase 4 closed at 3/3 with drift_score 1. GitHub Project board requires refreshed `project` scope and is intentionally skipped.

## Governance Status

Expand All @@ -88,10 +88,10 @@ Per-task telemetry is stored in GitHub issue comments before task closure. Adapt

## Next Steps

1. Start T4.3 (#391) in a separate task worktree from `origin/dev/delicious233`.
2. Keep packaged Desktop, sidecar, installer, signing, and release claims separate from Vite renderer and fixture Visual QA evidence.
3. Prefer Node/TypeScript/Playwright aggregation for cross-platform frontend acceptance; keep PowerShell for OS-specific Windows/Tauri/release gates.
4. Preserve `real_tested=false` boundaries unless an approved-real or packaged-release run is explicitly approved and executed.
1. Start T5.1 (#392) in a separate task worktree from `origin/dev/delicious233`.
2. Run the final acceptance matrix and keep each evidence level honest.
3. Preserve `real_tested=false` boundaries unless an approved-real or packaged-release run is explicitly approved and executed.
4. After T5.1, run T5.2 (#393) for merge readiness and external SPEC archive.

## Session Log

Expand Down Expand Up @@ -119,3 +119,4 @@ Per-task telemetry is stored in GitHub issue comments before task closure. Adapt
| 2026-06-29 | T4.2 implementation | Added Desktop/Web Visual QA metrics and report artifacts, locked their paths in the chat acceptance manifest, and verified the full chat acceptance bundle with `real_tested=false`; PR pending. |
| 2026-06-29 | Phase 4 sync | #390 merged via #414 and closed manually because non-default base did not auto-close it; milestone #20 is 2/3 complete with drift_score 1, and #391 is the active next task. |
| 2026-06-29 | T4.3 implementation | Added an explicit skipped `packaged-release` boundary row to chat acceptance, kept packaged Desktop proof opt-in, and verified docs/real-e2e/Tauri readiness contracts; PR pending. |
| 2026-06-29 | Phase 4 complete | #391 merged via #416 and closed manually because non-default base did not auto-close it; milestone #20 is closed at 3/3 with drift_score 1, and Phase 5 / #392 is active. |