Skip to content

prepare for next development cycle #4228

prepare for next development cycle

prepare for next development cycle #4228

Triggered via push November 25, 2025 14:48
Status Failure
Total duration 1m 40s
Artifacts

full-build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (ubuntu-latest, 21)
Process completed with exit code 1.
build (windows-latest, 21)
The strategy configuration was canceled because "build.ubuntu-latest_21" failed
build (windows-latest, 21)
The operation was canceled.
build (ubuntu-latest, 25)
The strategy configuration was canceled because "build.ubuntu-latest_21" failed
build (ubuntu-latest, 25)
The operation was canceled.
build (macos-latest, 21)
The strategy configuration was canceled because "build.ubuntu-latest_21" failed
build (macos-latest, 21)
The operation was canceled.