It should be possible to hand an action a set of dimensional, business vault and data vault models and let the system figure out which tables need to be updated first and what can be done in parallel tracks. We need to be able to do this per resource group.
It should have support for detecting that a table was already updated for a certain time window. This feature assumes that pipelines are executed with an execution location defined.
It should be possible to hand an action a set of dimensional, business vault and data vault models and let the system figure out which tables need to be updated first and what can be done in parallel tracks. We need to be able to do this per resource group.
It should have support for detecting that a table was already updated for a certain time window. This feature assumes that pipelines are executed with an execution location defined.